Model No.CM1014 □OB1014-B □ 697.68103-B □ARROWWorid’s Leading Makerof Storage Buildings®712741204BUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP ED
Anchoring Down The BuildingIt is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchori
Remove from bag of screws and save for the last stepOTTT65103#8-32 Hex Nut (188)65900A#10Bx1/2" Black Screw (4) (Packed with Screws)65923#8-32x3/
Parts in Carton OnePartNumberPartDescriptionQuantity in CartonCheckList8576 Right Gable 28577 Left Gable 26264 Horizontal Door Brace47743 Roof Panel 8
Parts in Carton TwoPartNumberPartDescriptionQuantity in CartonCheckList5986 Rear Wall Angle Rear Wall Channel210389 29365 Front Wall Channel 26635 Roo
Step 1• Parts Needed For • Floor Frame Assemblies• 8934 Ramp(1)• 9367 Front Floor Frame (2)• 8936 Rear Floor Frame (2)• 10387 Side Floor Frame (4)
step 2• Parts Needed For •Frame Assemblies• 5986 Rear Wall Angle (2)• 10389 Rear Wall Channel (2)• 10388 Side Wail Channel (4)• 10391 Side Wall An
Step 3• Parts Needed For •• 10386 Roof Beam (8)Roof Beam AssembliesS016The roof beams join the two gables and support the roof panels. The main
Step 4# Parts Needed For •• 6403 Door Track Splice (1)Door Track Assembly• 9366 Door Track (2)S017NOTE:Door Track Splice (painted part)
step 5Parts Needed ForFloor Frame• Front Floor Assembly (1)• Side Floor Assembly (2)• Rear Floor Assembly (1)1 Place the floor frame pieces t
step 6Parts Needed ForCorners• 6515 Wall Panel (2)• 9373 Front Wall Panel (2)• 6020 Corner Panel (4)NOTEThe remainder of the building assembly requ
Owner's ManualBefore beginning construction, check local building codes regarding footings, location and other requirements. Study and u
step?Parts Needed ForMid Frames• Rear Wall Channel Assembly (1)• Side Wall Channel Assembly (2)The mid frame pieces give rigidity to the side
Step 8Parts Needed ForTop FramesDoor Track Assembly (1)Rear Wall Angle Assembly (1) Side Wall Angle Assembly (2)The top frame pieces give rigidit
Step 9Parts Needed For •Wall Panels6515 Wall Panel (10)Each wall panel has a crimped rib on one side. The crimped rib should go under the rib of
Step 10# Parts Needed For • Front Channel/Door Jamb• 9369 Door Jamb (2)• 9365 Front Wan Channel (2)The door jambs reinforce the door opening a
step 11• Parts Needed For € Gable Assemblies• 8576 Right Gable (2)• 8577 Left Gable (2)• 6635 Roof Beam Bracket (4)The gables go on top of the
step 12Parts Needed ForGables/Braces• Left Gable Assemblies (2)• Right Gable Assemblies (2)• 9009 Gable Brace (2)1 Lift and fasten a right an
Step 13• Parts Needed For •• Main Roof Beam Assembly (1)Roof Beam//Braces• Single Roof Beam Assemblies (2)• 9204 Roof Beam Brace (2)SP261 Wrap the
step 14• Parts Needed For iRight Roof Paneli 9984 Right Roof Panel (1)Installing the roof panels is best done with a step ladder. Install the first ro
Step 15• Parts Needed For •Ridge Cap & Panels• 9983 Left Roof Panel (1)• 7743 Roof Panel (2)• 6797 Ridge Cap (1)1 Install a left roof pane! 998
Step 16• Parts Needed For •• 7743 Roof Panel (4)Ridge Cap & Panels• 6869 Ridge Cap (1)SP291 Install the second ridge cap 6869 overlapping th
Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be ca
step 17• Parts Needed For • Ridge Cap & Panels• 6797 Ridge Cap(i)• 7743 Roof Panel (2)• 9983 Left Roof Panel (1)• 9984 Right Roof Panel (1)1
step 18Parts Needed For Roof Trimi 6893 Left Side Roof Trim (2)> 6015 Side Roof Trim (2) i 6892 Right Side Roof Trim (2)1 Attach the right, left an
step 19Parts Needed ForDoor Assembly• 3719 Door Handle Brace (2)• 8538 Right Door (1)• 8539 Left Door (1)• 6264 Horizontal Door Brace (4)• 6278 V
step 20• París Needed For •Door Installation & AdjustmentRight Door Assembly (1) Left Door Assembly (1)SQ331 From inside the building, put
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurs when bare metal is exposed to moisture. Problem areas include
SAFETY FIRST® @Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling various
CARE & MAINTENANCE...Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch- up scratches as soon
ACCESSORIESROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation.
THISPAGEWASLEFTBLANKE^TENTIONALLY
THISPAGEWASLEFTBLANKINTENTIONALLY
The Foundation For Your BuildingOPTION 1; ARROW FLOOR FOUNDATION KIT; (Order No. FB1014-A or 68387-A) ... 'Arrow has the best base for you